Constructing the Point Cabrillo Diorama

Club member Mike Aplet was the man who had the vision and the skills to build the cliffs of our diorama of Point Cabrillo. He envisaged using Colin Davies prototypically accurate model of Point Cabrillo lighthouse atop the cliffs of the Point with the wreck of the Frolic on her side in the waters below. His material was old growth redwood obtained from a stump cut well over a 10o years ago. The stump was that of a redwood that probably lived for between 800 to 1,200 years.  His main tool was a sawzall. Mike took these pics as his year-long efforts progressed.

Below you can see the model of the lighthouse atop the cliff. This pic shows how Mike cut the pieces of redwood and fitted them together.

Point Cabrillo's many pieces of redwood

Point Cabrillo’s many pieces of redwood

Below you can see the finished sea with a wave breaking on the cliff.

The sea in the cove of Point Cabrillo

The sea in the cove of Point Cabrillo

These two shots are a before and after of the wave.

The sea before painting

The sea before painting

The broken hull of the Froliic was also carved by Mike.

Point Cabrillo cove sea painted

Here the sea has been painted

This pic is a close-up of the pieces that have been fitted together to make up the hull of the Frolic and the wave:

Carving the sea and the hull of the Frolic

Carving the sea and the hull of the Frolic

Here you can see the pieces that form the mermaid’s cave:P

Memsid's cave under construction

Memsid’s cave under construction

This one shows Mermaid’s Cave finished.

Mermaid's Cave

Mermaid’s Cave

Looking down on the cove in this shot. The landscaping on the top of the Point has yet to begin.

Point Cabrillo Cove - a seagull's view

Point Cabrillo Cove – a seagull’s view

The completed diorama. Dark backdrop in place. Cliff top a hive of activity.

Completed Point Cabrillo diorama

Completed Point Cabrillo diorama

Here are three shots of the detail on top of the cliff.

The west side of POint Cabrillo lighthouse

The west side of Point Cabrillo lighthouse

Watching for whales.

Whale watching

Whale watching

Charity book sale.

Charity book sale

Charity book sale

A brilliant piece of work Mike.

Mini Trestle for the West Wall

Club member Mike Aplet built this “mini” trestle. It has been worked into the west side wall hillside to extend the Toenail Ridge line.

Trestle undergoing test

Trestle undergoing test

Another view of the Trestle undergoing test

Another view of the Trestle undergoing test

The “test” engine is an 0-4-0 LGB which frequently works the Toenail Ridge line.