In our efforts to provide scenery “action” on all 360 degrees of the mainline Chuck Whilock has begun building a MOW station in the outside north west corner of the layout. In the two pics below you can see the first two buildings in place. Still be added is a water tank and fencing. Finally, the rest of corner will be planted with trees.
![First two buildings of the MOW way station installed](https://construction.mendorailhistory.org/wp-content/uploads/2018/09/First-two-buildings-of-the-MOW-way-station-installed.jpg)
First two buildings of the MOW way station installed on the north west outside corner of the MCMR&HS G Scale layout in Fort Bragg